Borley Engineering – LG, Newport

Offices

Extension to main site accommodation

Hire Duration: 26 Weeks

Delivery: April 2018

Borley hired from us the main site accommodation on site at LG Newport, they required more office space and approached us to extend the building.

We delivered an additional 14 Number 6.10m x 2.44m Modules to be stacked on the current setup. The additional Modules which spanned across the whole current Building, comprised of a large Open Plan Office area with a Meeting Room, Kitchen, Toilets and a smaller Office area.

We also installed our brand new Covered Staircase which was designed by our Managing Director Ellis John.


Borley Engineering LG

Brand new Covered Staircase which was recently designed by our Managing Director Ellis John